Still waiting on metal

 Roof paper went on 12/18. Now the builder says there is a delay from the factory on the roof metal, but yet cannot provide a delivery date. They cannot seem to stick to a schedule. I get that covid is causing delays, but they should be able to adjust that schedule and plan for delays. Everything has been open ended and non-committal. 

Here are some pictures taken this week after the dry days turned to rain. The inside was drying really well with the fans, but then the rain and drips started. Now we are back to sweeping out water a few times a day. I did have ProServ visit on Wednesday to put together a proposal on mold mitigation. 

This water is not coming in from the window