I don't count on anything the builder tells me at this point BUT we've been told the metal roof material will be here tomorrow. The roofer had told the GC they will be here Friday or Monday to install. I hope this timeline is correct as the rain is moving back in the end of next week. We are on 40 days of no activity (besides roof paper).
Drying out well with all the dry weather
Standing in living room, looking towards kitchen/nook area
Master bath shower
Master bath tub
Kids bathroom
Framing issue in the kids bedrooms - all related to the truss correction
No comments:
Post a Comment