We were both tired after working all day, but we jumped in and worked on the drains as well as cleaning out the crawl space. The foundation sub made a huge mess when they poured. Using a magnet tool Aleesa picked up most of the nails while I broke up the pieces of concrete and raked into a pile to later shovel outside the crawl space area. More to come tonight! Always more to do. .
We knew we wanted to have a webpage to document our home build process. It's been a long journey and one we want to be able to look back on. After the project started going downhill we realized documenting it was must.
Saturday, August 1, 2020
Subscribe to:
Post Comments (Atom)
Cedar deck complete, tiled porch . . still in progress
The back deck outside the 12' slider is only 4' deep to accomodate county code. We hope to add to it later when budget allows and/o...
-
I've been doing finishing touches on tile. I still have a lot of sealing to do on the river rock and marble tile in the kitchen. Today I...
-
As part of the original septic design we knew we needed to install an additional tank closer to the house that would feed into the other tan...
-
Crazy to think we started this process back in 2015 right before Mike deployed. TIMELINE: Early 2015 - Owner contract on land : A family f...
No comments: